Tuesday, August 6, 2019

Architectural Branding Essay Example for Free

Architectural Branding Essay The 4P’s have been extended to 7P’s namely: Price, Place, Promotion, People, Physical Evidence and Process. Architectural Branding is an important element of Physical Evidence very strongly prevailing in International Brands e. g. Calvin Klein, Nike town, DG, Prada etc. With the changing Indian Market scenario and customer awareness Indian Brands have now realised to incorporate the culture of Architectural Branding as an important brand element. Possibly Brands like Colour Plus, Wills Lifestyle, Sepia also are trying to incorporate the concept of Architectural Banding. Therefore through an exploratory research on the related topics of branding it was felt that architectural branding will help us in the long run in the industry and would widen our horizon of knowledge. Down the line I felt that this concept would be taught to us in our course curriculum of Fashion Management. Through this topic of Architectural Branding we would get to learn about basics of Architecture, Interior Design and Design Space and relating these subjects to the Market Research and Consumer Behaviour. Information Needed ? Introduction to Architectural Branding Concepts of Architecture †¢ Material †¢ Types of Structure ? Architecture in Retail †¢ Exteriors †¢ Interior Design †¢ Store Layout, Design

Monday, August 5, 2019

Beatboxing how it works in the brain

Beatboxing how it works in the brain Introduction As I was surfing through the internet, a viral video had caught my attention. At the time, it had roughly one million views and thus sparked my interest, so I watched it. In this video, a fairly large man began to move his lips and multiple sounds came out. He starts out slowly by setting a bass foundation and eventually adds a rhythmic part to the foundation. To the rhythm and foundation, he then adds a melody. Within the first 15 seconds, I recognize that he is indeed playing Bille Jean by Michael Jackson and it caught 100 percent of my attention. This man made me wonder how a human could possibly play 3 different parts of a song and how was he able to accomplish this feat. Now what was he doing in this video exactly? This man was beatboxing. Beatboxing is the art of producing drum beats, rhythm, and musical sounds using ones mouth, lips, tongue, voice, nasal passage and throat.[i] Thus this video had caused me to further examine beatboxing and try to answer the question: how is t his man able to play multiple different parts, when the only source is him? To attempt to even answer this question, this paper will first give a brief history on beatboxing to give the reader a basic understanding on the concept of beatboxing before exploring how this type of music interacts with the brain. The video clip will then be analyzed to form a conclusion based on the analysis. The Link: http://www.youtube.com/watch?v=ayzoj7YB7IA History of Beatboxing Prehistory of Beatboxing The root of beatboxing is vocal percussion and it has been a part of human history for hundreds of years and can be traced back to Africa. As part of African ritualistic music, vocal percussion patterns such as, hup, hup, hup, hup and Ch Ka Ch Ch were used to help performers become induced into a trance like state, in addition to using clapping and stamping to maintain rhythm. Then during the 17th Century, when African slaves were taken to plantations, African music was blended with European folk and brass band music becoming jazz and blues. These black slaves were generally poor and usually couldnt afford musical instruments and so improvised with their bodies and voices to create music. Claps and clicks became the drums, and low hums because the double bass; the two back bones of blues and jazz music. One would hum, one would clap, stick and hit things as the drums, and one would sing. This would eventually evolve into imitating many sounds, such as the shhchh of a soft snare and the tssa of the hi-hat being played with brushes. Blues groups found a way to make their music with nothing but their voicesImmediately, this form of vocal percussion became a staple of urban culture, that is, culture of the street.[ii] Old Skool: The Beginning of Beatboxing Beatboxing, like graffiti, seems to have begun as an urban art form. It appears with the beginning of hip-hop, which gets its start from DJs spinning records, while MCs are rapping. MCs could also be seen rapping over drum machine (also known as the beat box) beats. Since these drum machines couldnt have been purchased in the ghettos (aka poor urban cities), people began trying to imitate these drum machines with their mouths and thus became human beatboxers. New School: Beatboxing As We Know It Now During the 1990s, a new type of beatboxer appeared that developed new sounds and techniques. A great example of this is a beatboxer from 1999 called Rahzel, who used a method called auditory illusion to make listeners believe that he is indeed singing and beatboxing at the same time. The beatboxing song that Rahzel first revealed this new sound and technique with was If Your Mother Only Knew which was reconfigured from Aaliyahs 1997 song If Your Girl Knew. How Does Beatboxing Work in The Brain? Auditory Continuity Illusion Audio continuity affects whether a frequency component is thought of as being continuous in time or if a frequency component contains gaps. Our brains can perceive a song as being continuous, even if it is not. Auditory continuity works by filling in these missing gaps with a different sound, which our brain then fills in the missing portions of the song, even if they arent there. Our brain is thus producing a perception of a sound that is not truly there because it thinks that the two sounds are taking place at the same time. This is how Rahzel is able to make one believe that he is singing and beatboxing at the same time in the If Your Mother Only Knew song. What listener does really hear is this pattern: B[iff] your Pff[mother] B B[on] B[ly] B[knew] B[knew] B B B Pff B = Classic Kick Pff = Classic Snare although the brain actually interprets this pattern as 2 different streams. A link to this song is: Grouping by Pitch Proximity Tempo Beatboxing also works by increasing pitch separation and tempo. Our brain sets limits on what should be physically possible for instruments such as guitar strings or the human voice box. When the sounds we hear are outside of the brains limits, it thinks of other reasons why these sounds are outside. An example of this is: if we hear frequency changes that are way quicker than would normally be possible, the brain interprets it as coming from separate sources, even it is coming from a single source. This is because it is easier for the brain to believe that with multiple sources, the sound would reach the ear quicker. Thus beatboxing works by making the brain think that there are multiple sources creating the sound, when there is not. Beatboxing Song from Video Analysis In order to collect data from this video to analyze, I converted the video into an mp3 file using http://www.listentoyoutube.com/index.php . Then opened it into the WaveSurfer computer program and had it create both a pitch contour and spectrogram diagrams at different time intervals. This should reveal how the beatboxer in the video is able to create sounds that seem to come from multiple sources. The top box is the pitch contour and the bottom box is a spectrogram. Pitch Contour Spectrogram @ 10 mm/s Pitch Contour Spectrogram @ 50 mm/s Pitch Contour Spectrogram @ 100 mm/s Pitch Contour Spectrogram @ 250 mm/s As one compares the pitch contours, they are able to see that the beat boxer is actually putting into affect grouping by pitch proximity tempo to make the brain believe that there are multiple sources. He is able to change frequencies so fast that our brain is not able to comprehend the sound as coming from one source, as seen in the last diagram where pitch contour spectrogram are in 250 mm/s intervals. Conclusion Beatboxing is a perceived art; it makes us believe in something that isnt true. It is made clear that there is only one source producing all of the sounds, but the tricks of beatboxing tell our brains otherwise. By separating the different frequencies so quickly, our brain is not able to comprehend the sound coming from the same source and so we sense different streams. If there were indeed multiple sources, the spectrogram and pitch contours would have shown multiple frequencies overlapping one another, which clearly is not evident. Grouping by increasing pitch separation and increase tempo (speed in this case) is exactly how the beatboxer in the video is able to make me believe that there are multiple sources creating the sounds. Thus the question: how is this man able to play multiple different parts, when the only source is him, is solved. References [i] Vocal Echo. Humanbeatbox.com. 2009. Humanbeatbox.com, Web. 2 Mar 2010. . [ii] TyTe, , and Defenicial. The Real History of Beatboxing : Part 1. Vocal Echo 2008: n. pag. Web. 2 Mar 2010. . [iii] Al Bregman: Auditory Analysis. Web. 2 Mar 2010. .

Construction Method Statement Example

Construction Method Statement Example 1.0 Introduction This Construction Method Statement describes the development of six houses in three identical semi-detached blocks on a plot of land. The document will suffice for the majority of works undertaken during the construction but will require alterations or additions for certain projects. This method statement is a qualified assessment based on current information and is subject to refinement as the project evolves. This method statement is prepared to discuss about all the construction process and operations and also emphasize on the health, safety and environmental concerns. 2.0 Preliminary Works 2.1 Access and Material Distribution Constant flow of transport is needed during the construction period. Small access roads and driveways together with temporary roads are constructed to define site circulation routes and provide a suitable surface for plant movement (Chudley Greeno, 2008, p.118). A small access road is set up nearby the storage area of the site to transport materials that are required within a short space of time. A forklift will be used for material offloading and distribution around the site. The location of the access road shows in the Figure 1 site layout plan. Moreover, the road will be subjected to light and heavy day to day traffic such as concrete delivery, steel delivery lorries, brick and block delivery lorries and delivery vehicles generally. All the deliveries will be fitted into a delivery schedule system which is controlled by site personnel under guidance of Construction Manager. (Griffith Watson, 2004, p.392) Materials are closely phased and delivered when assembled which to achieve just-in-time management in this project. Materials that are transported with heavy goods vehicles (HGVs) are expected to take place at night and that certain works may have to be undertaken during this period so that it does not cause disruption to traffic flows, especially at peak times. 2.2 Storage Storage on site is erected to store materials, tools and equipments, spare parts for mechanical plant, and manufactured goods for incorporation in the work. (Griffith Watson, 2004, p.188) The distance between storage and activity areas keeps short to reduce transportation needs in terms of time. Timber and steel reinforcement will be stored in a dry safe place and special store for fuel oils needed by the requirement of legislation. (Griffith Watson, 2004, p.189) 2.3 Site Office A temporary site office will be provided on the site for management purposes and paperwork. These offices will be housed in modular portable units. The size of site office will be calculated based on an example below: Size Example: Office for site agent and assistant plus an allowance for 3 visitors. Assume an internal average height of 2.400. Allow 3.7m2 minimum per person and 11.5m3 minimum per person. Minimum area = 5 x 3.7 = 18.5m2 Minimum volume = 5x 11.5 = 57.5m3 Assume office width of 3.000 then minimum length required is = 57.5/ (32.4) = 57.5/7.2 = 7.986 say 8.000 Area check 38 = 24m2 which is > 18.5m2; satisfactory (Chudley Greeno, 2008, p.94) 2.4 General Site Facilities General site facilities such as toilets, changing facilities, canteen, as well as shelter from inclement weather will be provided on site. Adequate heating, lighting and ventilation are required in all toilet, washing, changing, and accommodation. The requirements of each facilities are specified the Health and Safety Executive (HSE) legislation (Griffith Watson, 2004, p.192). The location of all the facilities must be close together for easy access. The site accommodation will be located in the north corner of the site so to suit site access strategy. A row of single storey accommodation will be needed in the project. All the facilities buildings build in portable. 2.5 Site Enclosure Fencing and Hoarding A minimum height of 2.4m hoarding and fencing will be erected around the perimeter of the site for protection (Griffith Howarth, 2001, p.252). Safety measures outlined by the Albert Building Code (ABC) must be followed. An external signposting will be installed around the hoarding to enable the site to be more visible. Caution signs will also be displayed on fences and gates so that people will be aware when passing through the site. There will be a principle gate to the site along with pedestrian gates for access. 2.6 Safety and Security For both security and safety reasons, site-bases security presence will be provided during normal working hours with a visiting patrol covering nights and weekends to protect against theft and vandals of storage. Site-based security presence with a full 24 hours will be in place during the later stages of the construction works and fit out prior to occupation (Griffith Watson, 2004, p.391). All entry points will be clearly signed with appropriate warning notice. Flood lightings with 500 watts in 7.50m high are installed as a measure of night security. (Chudley Greeno, 2008, p.91) Main Construction Work 3.1 Substructure Concrete strip foundation will be used as the foundation of the houses. Foundation works include excavating, earthwork support, concreting and bricklaying of the strip foundation. Trenches are excavated under the line of the walls and the soil at the bottom of the trenches is compacted. Rough sawn timber as strutting will be temporary support for the sides of excavation for strip foundation. At least 150mm of concrete is placed at the foot of the trench with a concrete pump and brick walls are then built up to the damp proof course (DPC) which will be at least 150mm above ground level. The DPC is bedded on a layer of mortar on each leaf of brick or block cavity foundation wall. (Osbourn Greeno, 1997, p.199) The depth of the strip foundation of 1m 1.2m is adequate to ensure the soil acting as the natural foundation cannot be affected by the weather and stake will be used to determine depth of concrete foundation (Osbourn Greeno, 1997, p.181 186). The strip foundation made of a cont inuous strip of concrete with 1:3:6 mix. Hardcore will be compacted using a vibrating plate or roller and the top of the hardcore is kept below the substructure block work so that the slab can be cast inside the walls. Concrete is protected with a sheet of hessian or sand in cold weather and sheet of polythene in hot weather. (Marshall Worthing, 2000, p.57) The provision of damp proof membrane (DPM) for the entire area on top is between the over site concrete slab and it will be done on a bed of sand or ash of 12mm thickness. 3.2 Superstructure 3.2.1 External Wall Cavity wall will be used in this project as it has good thermal insulation and weather resistance properties. Cement-lime mortar mixes is used to ensure adequate bond of ties to wall. An adequate size of vertical spacing will be required for door and windows opening. 3.2.2 Scaffolding In Mitchells Intro to Building (Osbourn Greeno, 1997, p.207) states that, As the work progress beyond a height where it is unreasonable for the bricklayer to lift materials from ground level, it will be necessary to erect scaffolding to support raised working platform. The scaffolding with aluminum alloy which connected by special fitting or couplings will be used to lay the upper floor wall. 3.2.3 Doors and Windows Temporary props will be erected until lintel construction has been complete. To connect the opening frames with the wall, rigid-angled galvanized mild steel lugs screwed to their side edges as the work proceeds. (Osbourn Greeno, 1997, p.203) DPC will be bedded when the work is carried out. 3.2.4 Internal Wall Work sequence will be similar to external wall but the internal wall is in single leaf. The partition wall will be positioned and used to separate spaces within the building into rooms. Insulated plasterboard will be installed through the wall to gain thermal for the building. (EDP Energy, 2010) 3.2.5 Roof Pitch roof which erected by timber trussed rafters space about 600mm at close centres to provide direct support for roof cladding and ceiling. (Osbourn Greeno, 1997, p.221) Install the ridge board on 2 end posts with temporary bracing and set it straight and level. Each rafters is nailed to the wall-plate which ready placed on a mortar bed on top of cavity block wall. (Osbourn Greeno, 1997, p.221) Prefabricated ladder fixed to the end trussed rafter. Fascia board fixed to the feet of rafter and barge board to the outer face of gable ladder. (Marshall Worthing, 2006 p.94) Install collar ties, purlin and bracing as needed for the rafters and ridge to prevent sagging over time. Timber trusses with bracing are manufactured off-site. Clay tiles will be laid in continuously on the timber battens on sarking felt with 45 degree sloping of pitched roof. Finishes 3.3.1 Internal Wall Finishes Plaster board will be applied to internal wall as finishes with wet plaster method. Half-hour fire resistance will be provided when 5mm coat of wet plaster and 9.5mm thickness wet plaster applied on both sides of partition wall. A gap which is used to provide additional air passage is left between the back of plaster board and the face of the wall. Then the gap will be connected to the cavity to the internal environment to allow air leakage. (Emmitt Gorse, 2005, p.535) Emulsion paint with Water Based Paints Timber will be painted through the wall using the roller method. (Chudley Greeno, 2008, p.669)Skirting board with 19mm thickness will be nailed to the concrete fixing blocks at the base of walls after plastering is completed. (Emmitt Gorse, 2005, p.548-549) 3.3.2 Floor Finishes Skim coats with mix of cement and water applied with a steel float to make smooth finish on screed to allow carpet laid on it as floor finishes. Tackless strip placed around the entire perimeter rooms and shoot masonry screws into the strip and cut the strip by tin snip. Underlayment will be pour to hold the carpet padding. (Beach,1999-2010) 3.3.3 Ceiling Finishes Plasterboard ceiling made with a core of gypsum sandwiched between face sheets of strong durable paper with 2.4 x 1.2 x 9.5 mm thick at centres and it fixed to joist by nailing. Then, 5mm single coat board finish plaster over bonding grade undercoat. (Chudley Greeno, 2008, p.664) 3.4 Existing Services Existing services drawings will be obtained for the site area, which are applicable to the complete development and must be referred to at all times. Prior to any mechanical excavation commencing, each suspect area will be hand dug to confirm the depth and location of any service and clearly marked on the surface. Extreme care will be taken when planning to work in these vicinities i.e. double check with CAT and Genny and follow above procedures. (Marriott 2009) 4.0 Health and Safety 4.1 Significant Hazard Hazard:Â  Moving plant or vehicles Risk:Â  Operative have to be trained and competent to operate the plant or equipment. They should understand the emergency and evacuation procedures. ( Prifysgol Bangor University, 2001-2010) Control Measure:Â  Isolating workers or pedestrians from the moving plant. (Department of Labour, 2007) Maintenance and servicing of plant. (Department of Labour, 2007) Operator must follow all the directions in the hazard management. (Department of Labour, 2007) Hazard:Â  Falls of materials Risk:Â  Materials fall as bricks or steel through hole or gap will cause injury people working below. Control Measure:Â  Keeping working platforms clear of loose materials. Provide a way of preventing materials or other objects rolling, or being kicked, off the edges of platforms by with toe boards, solid barriers, brick guards etc at open edges. ( Prifysgol Bangor University, 2001-2010) Hazard:Â  Safe working platform Free of openings and traps through which peoples feet could get caught, causing them to trip, fall or be injured. ( Prifysgol Bangor University, 2001-2010) Risk:Â  Risk of fire may be occurred. Control Measure:Â  Good housekeeping with keeping the workplace cleans all the time. ( Prifysgol Bangor University, 2001-2010) Hazard:Â  Work at height Risk:Â  Accident as falling from height during laying brick or block at height level and also cladding and roofing. Control Measure:Â  Temporary scaffolding will be used during the height risk works. Assess weather condition before working at high take place. 4.2 Personal Protective Equipment Personal Protective Equipment (PPE) is an effective method of controlling occupational hazard. Operatives have to wear safety helmet at all times on site. Besides, suitable safety footwear such as steel-toe-capped boots will be worn by all company personnel. Casual shoes and trainers will not be permitted. All personnel are required to wear high visibility jacket or clothing at all times. This clothing must be suitable for the working environment and prevailing weather conditions. Eye goggles, hearing and respiratory protection and protective clothing will be made available for use where required and according to on site conditions. Furthermore, gloves have to be worn all the time can trap hazardous chemical against skin. 5.0 Potential Environment Impact A review of the potential environment impacts associated with construction works are being considered. Below is a table of the different environment Impacts: Issue:Â  Water contamination Potential Impact:Â  Run-off from plant or vehicle washing. Issue:Â  Material spill to drains and watercourses. Potential Impact:Â  Discharge of contaminated water. Issue:Â  Ground contamination Potential Impact:Â  Disturbing contaminated ground. Issue:Â  Wind blow contamination. Potential Impact:Â  Existing contamination of site. Issue:Â  Spillage and leakage of hazardous substances. Potential Impact:Â  Noise and vibration contamination Issue:Â  Increased road noise levels from vehicles. Potential Impact:Â  Particular methods of construction or use of heavy plant, equipment and haulage. Issue:Â  Traffic Potential Impact:Â  Traffic congestion caused by site. Issue:Â  Increased vehicle movements mainly consisting of heavy goods vehicles. Potential Impact:Â  Transfer materials from vehicles into public road as main road. Issue:Â  Disruption from abnormal or hazardous loads. Potential Impact:Â  Exhaust emissions cause air pollution. Issue:Â  Plant and wildlife contamination Potential Impact:Â  Habitat disruption or destruction Issue:Â  Disruption to wildlife activity Potential Impact:Â  Changes to natural environments ( noise, dust, light ) Issue:Â  Disruption to food or water sources. Potential Impact:Â  Historic/archaeological contamination Issue:Â  Disruption or destruction of natural features Potential Impact:Â  Disruption by temporary works like access road Table 1: Potential Environment Impact

Sunday, August 4, 2019

A Discussion of the Social Effects of Biotechnology Essay examples --

A Discussion of the Social Effects of Biotechnology The world of work in agriculture is in a process of rapid change. While "change" is by no means alien to agriculture, something new has entered the arena which promises and/or threatens to fundamentally alter agricultural practices across the globe. Biotechnology has already begun to be implemented resulting in what may be important shifts in not only agricultural production, but indeed changes in the very makeup of agricultural products themselves. This promises to pose serious challenges and/or opportunities to farmers across the globe. However, this may of course depend where it is particular farmers stand in relation to the power and socio-economic relations surrounding biotechnology. Indeed, this new and rapidly expanding1 field of technology is by no means some "invisible hand" or politically neutral" futuristic vision" (such as that presented at Disney's EPCOT Center) that will shape the way we produce and consume food. Those who will control the manner in which biotechnology is applied to agriculture will, and indeed are, acutely shaping the social relations that are structured around it. Biotechnology and its accompanying industries, such as genetic engineering, have become the "buzz words" of the day much in the same way nuclear energy was discussed in the early days of nuclear power. It is held up, for example, as holding the promise of solving the world's food shortages. According to major corporations involved in biotechnology, such as Monsanto2 , genetic engineering heralds the wave of the future. They argue that this technology will not only be able to provide for the world's food sources, but will likewise help preserve the environment. Farming of th... ...en a dramatic turn. At the end of last year, Mr Shapiro announced that the company,...would spin off the core of the firm, a chemicals business with sales of around $3 billion in sales-half from agricultural products,....However, Mr Shapiro has made it clear where he wants Monsanto to go. The firm, he believes, should be the main provider of the "agricultural biotechnology " the world will need if it is to feed itself in the future without despoiling the environment." (ibid.) from many of the webpages which are linked to this page. Below are listed the prinicipal web-pages: (www.aphis.usda.gov/oa/endanger.html), (www.aphis.usda.gov/oa/safebiot.html), (www.aphis.usda.gov/oa/overseas.html), (www.ces.ncsu.edu/san/htdocs/docs/other.html), (www.soybean.com), (www.sarep.ucdavis.edu/concept.htm), (www.caff.org), (www.oilseeds.org), (www.fsu.usda.gov/pas/default.asp)

Saturday, August 3, 2019

Antigone :: essays research papers

The debate over who is the tragic hero in Antigone continue on to this day. The belief that Antigone is the hero is a strong one. There are many critics who believe, however, that Creon, the Ruler of Thebes, is the true protagonist. I have made my own judgments also, based on what I have researched of this work by Sophocles. Antigone is widely thought of as the tragic hero of the play bearing her name. She would seem to fit the part in light of the fact that she dies in doing what is right. She buries her brother without worrying what might happen to her. She "Takes into consideration death and the reality that may be beyond death" (Hathorn 59). Those who do believe that Antigone was meant to be the true tragic hero argue against others who believe that Creon deserves that honor. They say that the Gods were against Creon, and that he did not truly love his country. "His patriotism is to narrow and negative and his conception of justice is too exclusive... to be dignified by the name of love for the state" (Hathorn 59). These arguments, and many others, make many people believe the Antigone is the rightful protagonist. Many critics argue that Creon is the tragic hero of Antigone. They say that his noble quality is his caring for Antigone and Ismene when thier father was persecuted. Those who stand behind Creon also argue that Antigone never had a true epiphany, a key element in being a tragic hero. Creon, on the other hand, realized his mistake when Teiresias made his prophecy. He is forced to live, knowing that three people are dead because of his ignorance, which is a punishment worse than death. My opinion on this debate is that Antigone is the tragic hero. She tries to help her brother without worrying about what will happen to her. She says, "I intend to give my brother burial. I'll be glad to die in the attempt, -if it's a crime, then it's a crime that God commands" (Sophocles 4). She was also punished for doing what was right. Her epiphany came, hidden from the audience, before she hung herself. Creon's "nobleness" of taking in young Antigone and Ismene is overshadowed by his egotistical nature. He will not allow justice to come about simply because he wants to protect his image. He says, "If she gets away with this behavior, call me a woman and call her a man" (Sophocles 13). These elements prove that Antigone is the tragic hero. Creon, understanding his ignorance may lead one to believe that he

Friday, August 2, 2019

Characteristics of a Good Boss Essay

Thesis statement: To be a good boss you must have many qualities such as setting priorities; you also have good communication skills, and last treating all employees fair. I. (1st complete topic sentence, including transition) First you have to set your priorities straight A. Setting priorities first requires organization B. A well-organized boss has schedules, information, and supplies kept in such a manner that can be easily accessed. C. They are focused to constantly rearrange their team’s priorities to meet pressing demands. D. Check in with the team on a regular basic II. (2nd complete topic sentence, including transition) Second, you must have good communication skills A. Great bosses communicate their vision, goals, plan, and expectations well. B. Good communication means better relationships in the work environment. C. Explain the effect of in appropriate problem a boss may use D. They keep their employees informed so that they are not caught unaware. III. (3rd complete topic sentence, including transition) In addition, you also have to treat you employees fair. A. Boss treats their employees with the same amount of respect. B. They also treat their employees as members of the team C. They show understanding and the appropriate support of other team members to help get the job done. D. They treat fellow members with courtesy and consideration. Concluding restatement of thesis: I think the qualities of a good boss is the most important to employees because if you need any assistance they are there to assist you.

Thursday, August 1, 2019

Royal Malaysia Customs Department: Parking Problems

Parking problem at Royal Malaysia Customs Department and its solutions. Parking at the Royal Malaysia Customs Department has been a difficult proposition. Rising the necessary additional units and support staffs have Increased demand for parking. The building is ill-equipped to accommodate the rise of population growth which only exacerbates the problem. Taking into account of the problem, a number of potential solutions are proposed; these include a park and ride information system facilities, bicycle facllltles and vehicle stacking will be further explain below. TheHeadquarters of Royal Malaysia Customs Department Is located in the centre of administration in Putrajaya, in which park and ride services are made available. However, the park and ride lots are a different situation. Location, size, accessibility, cost, and frequency ot transit service can have a significant effect on how popular the service Is. An advanced traveller Information system could be Implemented for the park and ride lots in Centre of Administration in Putrajaya. This would provide real- time details about the availability of parking spaces in each of the park and ride lots through a variety of media.The information provided through this system is likely to be most useful on corridors where there Is both an ‘inner-ring' and ‘outer-ring' park and ride lot. For example. a car coming from precinct 17 is likely to prefer parking at Alamanda Putrajaya since that facility is served by two buses that run more frequently than at the Precinct 8 park and ride lot. If he drives as far as the north to Alamanda Putrajaya, only to find that there are no spaces, he Is left with several choices: drive to the Precinct 8 or Precinct 9 lots. pay for parking on or near offce building, or turn back and park at the precinct 16 lot.In any case, he pays a penalty in lost time and extra petrol; if he parks in town, he will also be paying an additional fee. If, however, he knew that the Alamanda Putr ajaya lot was full before he reached the other lot, he could park there and save himself time, money, and frustration. Second, to be in line with government encouragement to use bicycle, hence the bicycle facility improvements should address two elements in order to embolden the use of this mode. Travel facilities, such as bike lanes, wider shoulders, off-road bike paths, and the like, help make the Journey safer and more pleasant.Storage facilities in the building should be convenient and secure. This could take the form of bike lockers which provide dry, secure storage. Bike shelters could be added in areas with existing bike parking, which would protect parked bikes from the weather. one interesting fact of people who commuted by bicycle to workplace is the amount of money a person could save a year. This makes sense because the cyclist usually less concern about the hike of petrol rates and parking fees. The main concern of a cyclist is likely about the security and protection o t their bicycles while parked.Lastly, nother option to decrease the demand for parking at Royal Malaysia Customs Department is by vehicle stacking, a mechanical parking solution that enables multiple vehicles to be parked in the footprint of a single vehicle. This presents a potential method for increasing the number of parking spaces. In the context of the tOf2 Royal Malaysla customs Department DullOlng, tnls type 0T tecnnology Is only sulta for use in parking decks. Future parking structures could be designed to accommodate vehicle stackers; however, this type of technology requires a trained operator and thus is only suitable for valet parking.These devices are also unsuitable for many types of vehicles, including vans and trucks. Stackers require significant capital outlay per space, plus additional electricity requirements for each stacking mechanism. At the current time, these drawbacks mean that vehicle stacking is unlikely to be a practical solution at Royal Malaysia Customs Department. In conclusion, parking problems at Royal Malaysia Customs Department can be reduced by making efforts to improve the facilities of park and ride information system, provide safer and conducive surrounding to cycle and offer car stacking technology in the building.